New Try Terra agents

Frontier AI for
real estate.

One agent for sites, power, planning and ownership.
Grounded in live data across the UK and EU.


Overview

AI that knows the land.

Where can I connect 300 MW? Who owns this field? What is in planning next door? Terra answers in seconds, with sources.

Live in the UK and EUMillions of recordsSources on every answer
M25A10EnfieldBrimsdownWaltham AbbeyChingfordKing George V
Where can I connect 50 MW around north London?
Thought for 6s · searched grid capacity and brownfield land
41 substations have the headroom. Best positioned:
Brimsdown615.6 MW
Elstree610.8 MW
City Road527.9 MW
Ask anything

From a quick check to a full site search, Terra does a day of desk work in one question.

  • Find sites against any criteria
  • Check power, risk and planning in seconds
  • Every answer shows its sources
Where could we connect 300 MW in the East Midlands?
Thought for 7s · searched grid capacity and land supply

Six substations can take it, three with land to match:

Staythorpe · 620 ha within 3 kmfirm
High Marnham · rail-served landfirm
West Burton · queue pressure risingwatch

Staythorpe is the standout: capacity, flat land and no designations on the parcels that matter.

See it on the map

Answers land as pins, parcels and layers. Click anything to open the full picture.

  • Power, planning and ownership layers
  • A full card for any site or substation
  • Draw an area, screen everything in it
M8M9GlasgowEdinburghGrangemouthLivingstonPentland Hills
Bring your own land bank

Upload your pipeline. Ask one question across your sites and the whole market.

  • Private to your workspace
  • Matched to live records on upload
  • Know when one of your sites gets better
landbank.csv · 61 sites · matched to the live records
Which of our option sites just got better?
Thought for 4s · compared your pipeline with this month’s changes

Two of your sites sit next to capacity that turned green this month:

Option site 14 · Suffolk1.2 km to grid
Option site 31 · Kent2.6 km to grid
Where could we connect 300 MW in the East Midlands?
Thought for 7s · searched grid capacity and land supply

Six substations can take it, three with land to match:

Staythorpe · 620 ha within 3 kmfirm
High Marnham · rail-served landfirm
West Burton · queue pressure risingwatch

Staythorpe is the standout: capacity, flat land and no designations on the parcels that matter.

M8M9GlasgowEdinburghGrangemouthLivingstonPentland Hills
landbank.csv · 61 sites · matched to the live records
Which of our option sites just got better?
Thought for 4s · compared your pipeline with this month’s changes

Two of your sites sit next to capacity that turned green this month:

Option site 14 · Suffolk1.2 km to grid
Option site 31 · Kent2.6 km to grid
The data

Everything that shapes a site, already inside.

Ownership, planning, power and market movement across the UK and EU, unified into one model of the land and refreshed around the clock.

24M+
land parcels mapped
45k
grid assets tracked
24/7
refreshed, register by register
Features

An analyst, not a search bar.

Terra plans the work, shows its reasoning and turns answers into workflows your team can run again and again.

Projects

Shared workspaces that watch your sites and tell you when something moves.

Skills

Your screens as one-click playbooks: the same method, run the same way, every time.

Export

Any answer becomes a table, ready for GIS, Excel or the committee pack.

Enterprise

Run it across the team.

For teams

  • Workspaces, roles and admin controls
  • Shared projects, briefs and saved views
  • Your data stays yours, always
Talk to us

Get access

  • Rolling out to teams in land, power and data centres
  • Onboarding with your own screens and skills
  • Live in the UK and EU
Request access

And much more.

Constraint checks
Flood, heritage and designations for any point, in seconds.
Market movement
See capacity flips and new applications as they happen.
Morning brief
What moved on your sites, in Slack before you sit down.
Ownership
Ask who owns anything, and what they bought lately.
Local plans
Where each authority stands, and what that opens up.
Opportunity score
A nightly rank of the grid positions worth a look.
Site cards
The full story of any site or substation in one panel.
Saved views
Your screens and columns, kept for the whole team.

Landpower runs on Terra.

01

Request access

Tell us about your team.

02

Load your data

Terra joins it to the market.

03

Ask

Start with today's question.

Stop searching. Start asking.